• Gold Coppe Clp Ore Beneficiation Line
  • Gold Coppe Clp Ore Beneficiation Line
  • Gold Coppe Clp Ore Beneficiation Line
  • Gold Coppe Clp Ore Beneficiation Line
  • Gold Coppe Clp Ore Beneficiation Line
  • Gold Coppe Clp Ore Beneficiation Line

Gold Coppe Clp Ore Beneficiation Line

Type: Clp
Voltage: 220/380/415/440V
Weight: >10T
Material: Carbon Steel
Material Feature: Oil Resistant
Certification: ISO9001:2008, ISO9001:2000, CE
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2009

Suppliers with verified business licenses

Henan, China
to see all verified strength labels (17)
  • Overview
  • Product Description
  • Company Profile
  • Certifications
Overview

Basic Info.

Model NO.
gold cil process
Energy Saving
Energy Saving
Warranty
2 Years
Color
Customized
Customized
Customized
Condition
New
After-sales Service
24hours
Transport Package
Export Standard
Specification
ISO9001, CE
Trademark
Hongji
Origin
Zhengzhou, Henan
Production Capacity
100sets/Month

Product Description

Product Description

 

Gold Coppe Clp Ore Beneficiation LineIntroduction of Gold CIL Plant
Gold CIL process (carbon in leach) is an efficient method of extracting and recovering gold from its ore. By cyaniding and carbon leaching crushed gold ore slurry simultaneously, CIL process lowers the gold mining operation cost and increases gold recovery rate to a degree of 99%. It is the first choice of modern gold mining and gold beneficiation plant.
Gold Coppe Clp Ore Beneficiation Line
  1. After the crushing and grinding stage, add 9 step-arranged high-efficiency cyanidation leaching tanks into the pulp. Gold pulp cyanidation is carried on the first two leaching tanks, countercurrent adsorption operation is carried on the last six or seven leaching tanks (cyanidation and adding activated carbon simultaneously). Gold Coppe Clp Ore Beneficiation Line
  2.  In the adding activated carbon step, add the coconut shell activated carbon (small hole, high activity, wear-resisting and renewable) specially selected by professional engineers team mineral processing design institute into the pulp, which can dissolve and adsorb the gold and silver ions then form the gold loaded carbon according to the characteristics of gold and silver adsorption.   
  3. Vibrating screen and dewatering screen are the key equipment for the reverse movement of pulp and carbon. Filter press and high frequency dewatering screen developed by professional engineers can effectively reduce the carbon wear on the surface of vibrating screen and in the process of continuous slurry pumping, and reduce the cost, facilitate the maintenance and operation.Gold Coppe Clp Ore Beneficiation Line
  4. The desorption electrolysis system implements high-temperature desorption electrolysis on gold in the gold-loaded carbon through the mixed liquor of sodium cyanide and sodium hydroxide. After wood chips and other sundries are removed by washing machine, and the gold desorption is carried out by high-temperature and high-pressure desorption method (150 degrees and 0.5Mpa), which can resolve 99% of gold within 2-6 hours.  Gold Coppe Clp Ore Beneficiation Line Application of Gold CIL Plant: Mainly Applies for The Process of Above 1g/T Grade Gold Ore and Gold Ore with Large Bearing Ore Volume: Silver, Platinum, Copper, Etc. a Better Performance in Extracting These Minerals at The Same Time. And Mineral Dressing Test Center Can Help You with The Component Testing of Your Ores.
    Company Profile

    Gold Coppe Clp Ore Beneficiation Line

Certifications

Gold Coppe Clp Ore Beneficiation Line

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2009

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Main Products
Ball Mill, Magnetic Separator, Rotary Dryer, Compound Fertilizer Machine, Active Lime Kiln, Flotation Machine, Rotary Kiln, Cone Crusher, Mobile Crusher Plant, Coal Gas Generator
Number of Employees
122